A bar screen installed on a flood control station

Mar 25, 2019

In department 94, we recently replaced a competitor's bar screen at a flood control station.

So as not to change the existing context, we proposed an XG12 type automatic bar screen, i.e. with waste discharge downstream.

The operation of the bar screen is based on a cadence/duration, but also on the upstream water level, detected by an Ultra Son probe.

TECHNICAL DATA

Supply of a bar screen

  • Type XG12
  • ALL STAINLESS STEEL 304L
  • Flow rate 1440m3/h
  • 10mm air gap
  • Depth of installation surface 3500mm
  • Two-piece chassis
  • Electrical equipment to ATEX standard
  • FB standard electrical box Processes fixed outside the ATEX zone

Project photos

Old competitor bar screen

New downstream bar screen

New upstream bar screen