At a wastewater treatment plant in the Doubs region, we have just replaced a manual screen with an SG400 automatic bar screen.

The existing context :

  • Manual grate positioned in a 570mm-deep channel, with a base at +2100mm above ground level,
  • The operator cleans the grate and deposits the waste in the INOX chute downstream, then pushes it into the waste bin below, via a vertical chute.

The customer's request:

  • Automate the removal of waste from the effluent, and deposit it directly in the waste bin.

 

Summary features of this project


  • 1 SG400 bar screen
  • All 304L stainless steel
  • 20mm air gap
  • Flow rate: 50m3/h
  • 1 304L stainless steel deflector to channel effluent
  • 1 304L stainless steel vertical waste chute
  • No changes to civil engineering
  • 1 FB Procédés electrical box
  • 1 assembly carried out by a FB Procédés technician

 

in-channel bar screen

Before

 

 

 

 

 

 

 

 

 

 

 

 

 

in-channel bar screen

Before

 

 

 

 

 

 

 

 

 

 

in-channel bar screen

After

 

 

 

 

 

 

 

 

 

 

in-channel bar screen

After